This MedLibrary.org supplementary page on Surrey Iron Railway is provided directly from the open source Wikipedia as a service to our readers. Please see the note below on authorship of this content, as well as the Wikipedia usage guidelines. To search for other content from our encyclopedia supplement, please use the form below:
Related Sponsors
| Surrey Iron Railway | |
|---|---|
| Locale | England |
| Dates of operation | 1803–1846 |
| Track gauge | 4 ft 2 in |
| Length | 9 miles |
| Headquarters | Wandsworth |
The Surrey Iron Railway (SIR) was a 4 ft 2 in narrow gauge railway that linked the Surrey towns of Wandsworth and Croydon via Mitcham (all now in south London). It was constructed in the early years of the 19th century, opening on 26 July 1803.
Contents |
Origins
Short publicly subscribed plateways, like that to the Caldon Low quarries and the Little Eaton Gangway, had already been built. However, they were all part of canal projects. The original plan, first mooted in 1799, had been for a canal, but to take the necessary water from the streams in the area would have deprived the many water-powered mills and factories. This was the world's first railway to be publicly subscribed by Act of Parliament as a railway throughout.
Operation
It was horse-drawn, dedicated to goods. It was essentially a form of turnpike as users had to provide their own wagons and horses, paying a fee for use of the plateway (tramroad). This is remarkably similar to the modern arrangement under which a Train operating company pays track access charges to Network Rail.
Route
The nine-mile route followed the shallow valley of the River Wandle, then heavily industrialised with numerous factories and mills, from the River Thames at Wandsworth southwards to Croydon. A short branch also ran from Mitcham to Hackbridge. The line was subsequently extended as the Croydon, Merstham and Godstone Railway through Purley and Coulsdon to serve quarries near Merstham, opened 1805, closed 1838.
History
William Jessop was chief engineer of the latter venture only and the flat alignment of his route proved more long-lasting than the railway. The advent of faster and more powerful steam locomotives spelled the end for horse-drawn railways. In 1823, William James, a powerful shareholder in the SIR, tried to persuade George Stephenson to supply a locomotive for the line. However Stephenson realised that the cast-iron plateway could not support the weight of a steam locomotive and declined the offer.1 The SIR closed in 1846. Part of the route was reopened in 1855 by the Wimbledon & Croydon Railway, which was later absorbed by the London, Brighton and South Coast Railway. Much of the route remains in use by Tramlink.
See also
References
- ^ Rolt, L.T.C., “Great Engineers”, 1962, G. Bell and Sons Ltd, page 64
External links
- 200th anniversary commemoration
- Tramlink and the Surrey Iron Railway
- Recent photos and information relating to the SIR
Wikipedia content modification information:
- This page was last modified on 28 July 2008, at 23:50.
Wikipedia Authorship and Review
Wikipedia content provided here is not reviewed directly by MedLibrary.org. Wikipedia content is authored by an open community of volunteers and is not produced by or in any way affiliated with MedLibrary.org.
Wikipedia Usage Guidelines
This article is licensed under the GNU Free Documentation License. It uses material from the Wikipedia article on "Surrey Iron Railway".
The URL for this specific entry is:
All Wikipedia text is available under the terms of the GNU Free Documentation License. (See Copyrights for details). Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
